What are the calculation for form box for transmission line foundation projects .

6.0 FORMER BOXES: 6.1 Generally, the pyramid type of foundation is used which consists of two parts. The lower part is called the frustum and is the base of the foundation. The upper part is called the chimney which covers the stub angle. 6.2 Former boxes of the shape, size and dimensions for the individual […]

What are the calculation for form box for transmission line foundation projects . Read More »

What are the step of excavation of pits in foundation and template setting.

EXCAVATION OF TOWER FOUNDATION PITS: 4.1 While excavating, the earth is cut vertically / tapered / in steps as per the soil conditions at site to avoid any kind of mishap caused by collapsing of the pit sides during the course of excavation and foundation work. 4.2 The excavated earth is to be kept at